Prop up your phone and train. Repvana counts your reps in real time with the camera, coaches your tempo and effort, and keeps your whole training log. No wearables, no tapping between sets.
No sensors to strap on, no counting in your head. Repvana watches your body pose and does the bookkeeping while you focus on the set.
Lean your phone 2–3 m away, level with the movement. Side-on for curls and presses, facing you for squats. A one-screen guide shows you on your first camera set.
Reps count live on screen with your tempo for every rep. Step out of frame and counting just pauses. The camera never ends your set.
Rack the weight and Repvana asks. Tap Log set
or just say it. Your effort, tempo and a form note are saved with the set.
Two engines work together: hand-tuned recipes for popular lifts, and an adaptive engine that finds the moving joint for almost any exercise, including the ones you create.


Every camera set gets an automatic form note: estimated effort (RPE), tempo, and how much you slowed down. It's based on velocity-based training research, cited right in the app.


Your Rank comes from your last 28 days of training. Climb by showing up and beating your own lifts. Stop, and it slips. So a Diamond badge means you're training like one right now.
Titan and Olympian open with online seasons. Plus XP, levels, 200+ achievements, a weekly streak and a workout calendar.


The camera is the headline, but Repvana is a full workout tracker underneath. Use the camera when it helps, log by hand when it doesn't.
Full Body, Push/Pull/Legs, Upper/Lower and more. Pick how many days a week you train and Repvana builds the routines.

Per-exercise history, heaviest set, estimated 1RM, and charts over a month, a year, or all time.

Offline instructions for barbell, dumbbell, cable, machine, bodyweight and gymnastic rings.

Create custom moves and tell the camera which joint to watch, so it can count them too.

From your first workout to the Thousand Club, with XP and levels along the way.

Say start counting, stop counting, log set or skip rest. Chalky hands stay off the screen.
Keeps counting on your Lock Screen on iPhone and in a notification on Android.
The camera rests while you do, and an optional battery saver cuts power use further.
Optionally save finished workouts and body weight, and import your latest weight.
A checklist and reminders for the supplements you already take. A tracker only, not medical advice.
Screen-reader labels, scalable text, Reduce Motion support, and color-blind-safe status colors.
Switch phones, or train with a friend on the other platform. Your log, Rank and Pro come with you.
iOS 16 or later. Counting runs on Apple Vision, entirely on your phone, with a Live Activity rest timer and optional iCloud sync for your form videos.
The same app, built natively for Android. On-device pose detection, a home-screen widget, and a rest timer in your notifications.
Sign in with Apple or Google. One Pro subscription unlocks both platforms on the same account.
Rep counting and form analysis run on your phone. Camera frames are analyzed live and discarded, never uploaded.
Your training log syncs to your account so a new phone picks up where you left off. Videos stay on your device.
No third-party analytics, no advertising SDKs, and we never sell your data.
Camera counting, coaching, the full exercise library and your log are free. Pro removes the limits.
Prices in USD; your store shows local pricing. Auto-renewing, billed and managed through the App Store or Google Play.
A weekly streak, a calendar of every session, and a rewards screen after each workout with the XP, achievements and records you just earned.

No. Camera frames are analyzed live on your phone and thrown away. Form-review clips are optional and saved only on your device (on iPhone you can choose to sync them through your own iCloud).
Popular lifts have hand-tuned recipes (curls, presses, raises, squats and more), and an adaptive engine handles almost anything else by finding the joint that moves, including custom exercises you create. When the camera doesn't fit a movement, log it by hand like any tracker.
About 2–3 m away, level with the movement, with the working limb in frame. Side-on for curls and presses, facing you for squats. Even light on your body beats a bright window behind you. The app walks you through it on your first camera set.
Never. When you rack the weight Repvana suggests finishing the set, but it only logs when you tap Log set or say "log set".
No. Just your phone and something to lean it on.
Yes. Pro belongs to your Repvana account, so one subscription unlocks it on every phone you sign in to, on either platform.
Anytime, from your subscriptions in the App Store or Google Play. You keep Pro until the end of the period you paid for.
English and Spanish, across the app and this site.
Repvana is coming to the App Store and Google Play. Free to start, in English and Spanish. Leave your email and we'll tell you when it's out.